Where your money goes
In this section: Public services

Govia Thameslink Railway (Thameslink, Southern, Great Northern, Gatwick Express): subsidy, passengers and punctuality

Last updated . Figures refresh every night. How each figure is worked out.

£236m for Govia Thameslink Railway (Thameslink, Southern, Great Northern, Gatwick Express) in 2024-25, +1.6% on a year earlier after inflation. That is £0.82 per passenger journey in 2024-25 (2025-26 prices); a negative figure is a premium paid to the government. 67.7% of its trains arrived on time in 2025-26.

Figure as of 25 November 2025. Source: Office of Rail and Road, Office of Rail and Road.

Key figures

Source: Office of Rail and Road.

Source: Office of Rail and Road, Table 7226: franchised passenger train operator finances by franchise, published 25 November 2025; Office of Rail and Road, Table 7273: government subsidy by franchised passenger operator (up to 2018-19), published 14 November 2019.

Who runs it and who pays

Govia Thameslink Railway (Thameslink, Southern, Great Northern, Gatwick Express) is funded through Department for Transport. 31 May 2026: Transferred to public ownership (DfT Operator).

Changes of ownership and the 2020 emergency agreements are marked as breaks on the charts on this page. Every operator’s changes.

Income and costs

  1. UK total
  2. Nation
  3. Department or service body
  4. Local body (this level)
  5. Spending category not published
  6. Line or transaction not published

Cash is as published. Real terms are in 2025-26 prices, using HM Treasury’s GDP deflator. Per resident divides by ONS mid-year population for the area the body serves. Changes compare the same body in consecutive years.

These figures are published beside the funding, not as its result. Demand, geography, recording practice and many other things differ between areas and change over time; none of these charts shows cause and effect.

Where this sits: United Kingdom → England → Railways, England → Govia Thameslink Railway (Thameslink, Southern, Great Northern, Gatwick Express). Figures from data/services/transport.json, generated 29 September 2026.

Use this data

The figures belong to the bodies that published them and are used under their terms, listed in Sources for this page; most are Crown copyright under the Open Government Licence. Only our own words, analysis, charts and derived calculations are ours, published under CC BY 4.0: reuse them, including commercially, if you credit Tekstak Ltd and link back to this page.

Download

Sources for this page

Each source's figures are used under the licence shown. Our own words, analysis, charts and derived calculations are ours, under CC BY 4.0.

Sections