Transport for Wales Rail: subsidy, passengers and punctuality

Last updated . Figures refresh every night. How each figure is worked out.

£392m for Transport for Wales Rail in 2024-25, +12.2% on a year earlier after inflation. That is £12.95 per passenger journey in 2024-25 (2025-26 prices); a negative figure is a premium paid to the government. 69.7% of its trains arrived on time in 2025-26.

Figure as of 25 November 2025. Source: Office of Rail and Road, Office of Rail and Road.

Key figures

  • £392m2024-25, cash +16.7% on a year earlier As of 25 November 2025
  • £12.95Government subsidy per passenger journey, 2024-25 England and Wales operators: £2.13 As of 25 November 2025
  • 69.7%Trains on time, 2025-26 England and Wales operators: 66.5% As of 17 September 2026
  • 3.8%Cancellations, 2025-26 England and Wales operators: 3.7% As of 17 September 2026
  • 30.2%Fares as a share of operating costs, 2024-25 As of 25 November 2025

Source: Office of Rail and Road.

Over time: cash, real terms and per resident

Transport for Wales Rail: spending in cash and in 2025-26 prices, £ million

Real terms use HM Treasury’s GDP deflator, 2025-26 prices. Breaks in the series: 2015-16: Network Rail was reclassified to central government in September 2014; its spending counts in the railway line and the Department for Transport’s budget from 2015-16, which is why rail spending jumps that year. ORR’s operator subsidy also changes source that year. 2020-21: From March 2020 emergency agreements moved train operators’ revenue risk to the government, and bus operators received pandemic grants: support rose sharply in 2020-21 and 2021-22 while fares fell. 2020-21: Wales and Borders rail services have been run by Transport for Wales Rail Ltd, owned by the Welsh Government, since February 2021.

The numbers behind this chart
Transport for Wales Rail: spending in cash and in 2025-26 prices, £ million (£ million)
YearReal terms (2025-26 prices)Cash
2009-10
Details for 2009-10
£196.5m£128.6m
Cash
£128.6m
2010-11
Details for 2010-11
£185.7m£123.6m
Cash
£123.6m
2011-12
Details for 2011-12
£201.2m£136.8m
Cash
£136.8m
2012-13
Details for 2012-13
£202.9m£140.3m
Cash
£140.3m
2013-14
Details for 2013-14
£223.8m£158.0m
Cash
£158.0m
2014-15
Details for 2014-15
£150.3m£107.6m
Cash
£107.6m
2015-16
Details for 2015-16
£125.0m£90.1m
Cash
£90.1m
2016-17
Details for 2016-17
£129.7m£95.4m
Cash
£95.4m
2017-18
Details for 2017-18
£124.6m£92.8m
Cash
£92.8m
2018-19
Details for 2018-19
£187.6m£142.9m
Cash
£142.9m
2019-20
Details for 2019-20
£239.0m£186.8m
Cash
£186.8m
2020-21
Details for 2020-21
£429.7m£353.5m
Cash
£353.5m
2021-22
Details for 2021-22
£346.4m£285.6m
Cash
£285.6m
2022-23
Details for 2022-23
£293.4m£258.9m
Cash
£258.9m
2023-24
Details for 2023-24
£361.4m£335.7m
Cash
£335.7m
2024-25
Details for 2024-25
£405.4m£391.9m
Cash
£391.9m

Figure as of 25 November 2025. Source: Office of Rail and Road, Office of Rail and Road.

Source: Office of Rail and Road, Table 7226: franchised passenger train operator finances by franchise, published 25 November 2025; Office of Rail and Road, Table 7273: government subsidy by franchised passenger operator (up to 2018-19), published 14 November 2019.

Who runs it and who pays

Transport for Wales Rail is funded through Welsh Government. February 2021: Run by Transport for Wales Rail Ltd, owned by the Welsh Government, from February 2021.

Changes of ownership and the 2020 emergency agreements are marked as breaks on the charts on this page. Every operator’s changes.

Income and costs

Transport for Wales Rail: fare income, staff costs and operating costs, 2025-26 prices, £ million

From the operator’s accounts as ORR publishes them (table 7226), rebased with HM Treasury’s GDP deflator. The gap between costs and income is met mostly by government; from 2020-21 the government took the fares and paid the operator’s costs. ORR notes that operators divide costs between categories differently.

The numbers behind this chart
Transport for Wales Rail: fare income, staff costs and operating costs, 2025-26 prices, £ million (£ million, 2025-26 prices)
YearFare incomeOperating expenditureStaff costs
2015-16
Details for 2015-16
£188m£351m£155m
Operating expenditure
£351m
Staff costs
£155m
2016-17
Details for 2016-17
£193m£353m£144m
Operating expenditure
£353m
Staff costs
£144m
2017-18
Details for 2017-18
£195m£357m£150m
Operating expenditure
£357m
Staff costs
£150m
2018-19
Details for 2018-19
£199m£431m£158m
Operating expenditure
£431m
Staff costs
£158m
2019-20
Details for 2019-20
£186m£461m£179m
Operating expenditure
£461m
Staff costs
£179m
2020-21
Details for 2020-21
£31m£476m£190m
Operating expenditure
£476m
Staff costs
£190m
2021-22
Details for 2021-22
£114m£482m£200m
Operating expenditure
£482m
Staff costs
£200m
2022-23
Details for 2022-23
£145m£466m£207m
Operating expenditure
£466m
Staff costs
£207m
2023-24
Details for 2023-24
£157m£558m£238m
Operating expenditure
£558m
Staff costs
£238m
2024-25
Details for 2024-25
£181m£598m£263m
Operating expenditure
£598m
Staff costs
£263m

Figure as of 25 November 2025. Source: Office of Rail and Road.

Where it sits, and what is below it

  1. UK total
  2. Nation
  3. Department or service body
  4. Local body (this level)
  5. Spending category not published
  6. Line or transaction not published

Transport for Wales Rail

Net government subsidy to the operator (Welsh Government); negative figures are premiums it paid to the government. From 2015-16 this is ORR’s net franchise subsidy from the operator’s accounts, published in April 2024 to March 2025 and converted back to cash here; before that, the government’s payments to the franchise holder in cash.

£392m in 2024-25 (cash); £405m in 2025-26 prices; +16.7% on a year earlier in cash, +12.2% in real terms.

Spending category: not published. Government payments are not broken down further. The operator’s income and costs (fares, staff, rolling stock, track access) are published by ORR and shown on its page; they are the operator’s own accounts, not a breakdown of the subsidy.

Cash is as published. Real terms are in 2025-26 prices, using HM Treasury’s GDP deflator. Per resident divides by ONS mid-year population for the area the body serves. Changes compare the same body in consecutive years.

What is recorded alongside the money

These figures are published beside the funding, not as its result. Demand, geography, recording practice and many other things differ between areas and change over time; none of these charts shows cause and effect.

Transport for Wales Rail against England and Wales operators and All franchised operators, Great Britain: latest period of each measure
MeasureTransport for Wales RailEngland and Wales operatorsAll franchised operators, Great BritainPeriod
Government subsidy per passenger journey
Details for Government subsidy per passenger journey
£12.95£2.13£2.522024-25
England and Wales operators
£2.13
All franchised operators, Great Britain
£2.52
Period
2024-25
Trains on time
Details for Trains on time
69.7%66.5%66.7%2025-26
England and Wales operators
66.5%
All franchised operators, Great Britain
66.7%
Period
2025-26
Cancellations
Details for Cancellations
3.8%3.7%3.5%2025-26
England and Wales operators
3.7%
All franchised operators, Great Britain
3.5%
Period
2025-26
Fares as a share of operating costs
Details for Fares as a share of operating costs
30.2%not published71.4%2024-25
England and Wales operators
not published
All franchised operators, Great Britain
71.4%
Period
2024-25
Government subsidy per passenger kilometre
Details for Government subsidy per passenger kilometre
33.6 pencenot published6.9 pence2024-25
England and Wales operators
not published
All franchised operators, Great Britain
6.9 pence
Period
2024-25
Passenger journeys
Details for Passenger journeys
34.5 millionnot publishednot published2025-26
England and Wales operators
not published
All franchised operators, Great Britain
not published
Period
2025-26
Staff costs
Details for Staff costs
263.4 £ millionnot published4,603.9 £ million2024-25
England and Wales operators
not published
All franchised operators, Great Britain
4,603.9 £ million
Period
2024-25
Government subsidy per passenger journey: Transport for Wales Rail and comparisons

The operator’s net government subsidy (negative where it paid the government a premium) divided by its passenger journeys, in 2025-26 prices. Subsidy is ORR’s net franchise subsidy from 2015-16 and, before that, the government’s payments to the franchise holder (ORR table 7273, without its estimated share of the network grant), so there is a break at 2015-16. Worked out here from ORR’s figures. Breaks in the series: 2015-16: Subsidy before 2015-16 is from the government’s payment records (ORR table 7273); from 2015-16 from the operator’s own accounts (table 7226). 2020-21: From March 2020 emergency agreements moved revenue risk to the government: subsidy rose as fares fell, and later contracts pay a fee to run services for the government. 2020-21: Run by Transport for Wales Rail Ltd, owned by the Welsh Government, from February 2021.

The numbers behind this chart
Government subsidy per passenger journey: Transport for Wales Rail and comparisons (Government subsidy per passenger journey)
YearTransport for Wales RailEngland and Wales operatorsAll franchised operators, Great Britain
2011-12
Details for 2011-12
£7.08£-0.39£-0.02
England and Wales operators
£-0.39
All franchised operators, Great Britain
£-0.02
2012-13
Details for 2012-13
£7.00£-0.77£-0.41
England and Wales operators
£-0.77
All franchised operators, Great Britain
£-0.41
2013-14
Details for 2013-14
£7.49£-0.49£0.04
England and Wales operators
£-0.49
All franchised operators, Great Britain
£0.04
2014-15
Details for 2014-15
£4.89£-1.06£-0.75
England and Wales operators
£-1.06
All franchised operators, Great Britain
£-0.75
2015-16
Details for 2015-16
£3.97£-0.78£-0.49
England and Wales operators
£-0.78
All franchised operators, Great Britain
£-0.49
2016-17
Details for 2016-17
£4.02£-0.81£-0.55
England and Wales operators
£-0.81
All franchised operators, Great Britain
£-0.55
2017-18
Details for 2017-18
£3.78£-0.61£-0.31
England and Wales operators
£-0.61
All franchised operators, Great Britain
£-0.31
2018-19
Details for 2018-19
£5.61£0.05£0.39
England and Wales operators
£0.05
All franchised operators, Great Britain
£0.39
2019-20
Details for 2019-20
£7.51£0.52£0.89
England and Wales operators
£0.52
All franchised operators, Great Britain
£0.89
2020-21
Details for 2020-21
£85.58£32.02£33.80
England and Wales operators
£32.02
All franchised operators, Great Britain
£33.80
2021-22
Details for 2021-22
£19.63£7.78£8.40
England and Wales operators
£7.78
All franchised operators, Great Britain
£8.40
2022-23
Details for 2022-23
£12.67£3.10£3.55
England and Wales operators
£3.10
All franchised operators, Great Britain
£3.55
2023-24
Details for 2023-24
£13.77£2.27£2.68
England and Wales operators
£2.27
All franchised operators, Great Britain
£2.68
2024-25
Details for 2024-25
£12.95£2.13£2.52
England and Wales operators
£2.13
All franchised operators, Great Britain
£2.52

Figure as of 25 November 2025. Source: Office of Rail and Road.

Trains on time: Transport for Wales Rail and comparisons

Share of recorded station stops where the train arrived early or less than a minute late, over the financial year (ORR table 3133).

The numbers behind this chart
Trains on time: Transport for Wales Rail and comparisons (Trains on time)
YearTransport for Wales RailEngland and Wales operatorsAll franchised operators, Great Britain
2014-15
Details for 2014-15
60.1%64.6%64.5%
England and Wales operators
64.6%
All franchised operators, Great Britain
64.5%
2015-16
Details for 2015-16
61.5%63.3%63.2%
England and Wales operators
63.3%
All franchised operators, Great Britain
63.2%
2016-17
Details for 2016-17
60.6%62.0%62.0%
England and Wales operators
62.0%
All franchised operators, Great Britain
62.0%
2017-18
Details for 2017-18
63.8%62.8%62.8%
England and Wales operators
62.8%
All franchised operators, Great Britain
62.8%
2018-19
Details for 2018-19
62.7%63.6%63.5%
England and Wales operators
63.6%
All franchised operators, Great Britain
63.5%
2019-20
Details for 2019-20
60.5%64.8%65.0%
England and Wales operators
64.8%
All franchised operators, Great Britain
65.0%
2020-21
Details for 2020-21
80.7%80.1%79.8%
England and Wales operators
80.1%
All franchised operators, Great Britain
79.8%
2021-22
Details for 2021-22
67.1%73.4%73.1%
England and Wales operators
73.4%
All franchised operators, Great Britain
73.1%
2022-23
Details for 2022-23
59.8%67.6%67.8%
England and Wales operators
67.6%
All franchised operators, Great Britain
67.8%
2023-24
Details for 2023-24
60.3%67.3%67.6%
England and Wales operators
67.3%
All franchised operators, Great Britain
67.6%
2024-25
Details for 2024-25
62.2%66.8%67.0%
England and Wales operators
66.8%
All franchised operators, Great Britain
67.0%
2025-26
Details for 2025-26
69.7%66.5%66.7%
England and Wales operators
66.5%
All franchised operators, Great Britain
66.7%

Figure as of 17 September 2026. Source: Office of Rail and Road.

Cancellations: Transport for Wales Rail and comparisons

The cancellations score (a full cancellation counts one, a part cancellation a half) as a share of trains planned, over the financial year (ORR table 3123).

The numbers behind this chart
Cancellations: Transport for Wales Rail and comparisons (Cancellations)
YearTransport for Wales RailEngland and Wales operatorsAll franchised operators, Great Britain
2019-20
Details for 2019-20
2.8%3.5%3.4%
England and Wales operators
3.5%
All franchised operators, Great Britain
3.4%
2020-21
Details for 2020-21
1.8%2.1%2.1%
England and Wales operators
2.1%
All franchised operators, Great Britain
2.1%
2021-22
Details for 2021-22
4.0%3.4%3.3%
England and Wales operators
3.4%
All franchised operators, Great Britain
3.3%
2022-23
Details for 2022-23
4.5%3.8%3.7%
England and Wales operators
3.8%
All franchised operators, Great Britain
3.7%
2023-24
Details for 2023-24
5.1%3.9%3.7%
England and Wales operators
3.9%
All franchised operators, Great Britain
3.7%
2024-25
Details for 2024-25
5.3%4.3%4.1%
England and Wales operators
4.3%
All franchised operators, Great Britain
4.1%
2025-26
Details for 2025-26
3.8%3.7%3.5%
England and Wales operators
3.7%
All franchised operators, Great Britain
3.5%

Figure as of 17 September 2026. Source: Office of Rail and Road.

Fares as a share of operating costs: Transport for Wales Rail and comparisons

Fare income as a share of the operator’s operating expenditure (staff, rolling stock, track access and other costs), from its management accounts (ORR table 7226). Breaks in the series: 2015-16: Subsidy before 2015-16 is from the government’s payment records (ORR table 7273); from 2015-16 from the operator’s own accounts (table 7226). 2020-21: From March 2020 emergency agreements moved revenue risk to the government: subsidy rose as fares fell, and later contracts pay a fee to run services for the government. 2020-21: Run by Transport for Wales Rail Ltd, owned by the Welsh Government, from February 2021.

The numbers behind this chart
Fares as a share of operating costs: Transport for Wales Rail and comparisons (Fares as a share of operating costs)
YearTransport for Wales RailAll franchised operators, Great Britain
2015-16
Details for 2015-16
53.4%101.9%
All franchised operators, Great Britain
101.9%
2016-17
Details for 2016-17
54.6%101.9%
All franchised operators, Great Britain
101.9%
2017-18
Details for 2017-18
54.8%97.6%
All franchised operators, Great Britain
97.6%
2018-19
Details for 2018-19
46.0%89.3%
All franchised operators, Great Britain
89.3%
2019-20
Details for 2019-20
40.2%81.9%
All franchised operators, Great Britain
81.9%
2020-21
Details for 2020-21
6.6%14.6%
All franchised operators, Great Britain
14.6%
2021-22
Details for 2021-22
23.6%44.3%
All franchised operators, Great Britain
44.3%
2022-23
Details for 2022-23
31.1%63.7%
All franchised operators, Great Britain
63.7%
2023-24
Details for 2023-24
28.2%69.7%
All franchised operators, Great Britain
69.7%
2024-25
Details for 2024-25
30.2%71.4%
All franchised operators, Great Britain
71.4%

Figure as of 25 November 2025. Source: Office of Rail and Road.

Government subsidy per passenger kilometre: Transport for Wales Rail and comparisons

Net franchise subsidy divided by passenger kilometres travelled on the operator, in 2025-26 prices, from 2015-16. Long-distance operators carry passengers further, so this is the fairer comparison between them and commuter operators. Breaks in the series: 2015-16: Subsidy before 2015-16 is from the government’s payment records (ORR table 7273); from 2015-16 from the operator’s own accounts (table 7226). 2020-21: From March 2020 emergency agreements moved revenue risk to the government: subsidy rose as fares fell, and later contracts pay a fee to run services for the government. 2020-21: Run by Transport for Wales Rail Ltd, owned by the Welsh Government, from February 2021.

The numbers behind this chart
Government subsidy per passenger kilometre: Transport for Wales Rail and comparisons (Government subsidy per passenger kilometre, pence)
YearTransport for Wales RailAll franchised operators, Great Britain
2015-16
Details for 2015-16
10.3-1.3
All franchised operators, Great Britain
-1.3
2016-17
Details for 2016-17
10.6-1.5
All franchised operators, Great Britain
-1.5
2017-18
Details for 2017-18
10.0-0.8
All franchised operators, Great Britain
-0.8
2018-19
Details for 2018-19
15.11.0
All franchised operators, Great Britain
1.0
2019-20
Details for 2019-20
20.42.3
All franchised operators, Great Britain
2.3
2020-21
Details for 2020-21
230.3105.3
All franchised operators, Great Britain
105.3
2021-22
Details for 2021-22
47.121.5
All franchised operators, Great Britain
21.5
2022-23
Details for 2022-23
30.09.4
All franchised operators, Great Britain
9.4
2023-24
Details for 2023-24
33.97.3
All franchised operators, Great Britain
7.3
2024-25
Details for 2024-25
33.66.9
All franchised operators, Great Britain
6.9

Figure as of 25 November 2025. Source: Office of Rail and Road.

Passenger journeys: Transport for Wales Rail and comparisons

Passenger journeys on the operator’s trains in the financial year (ORR table 1223), from ticket sales and estimates for travel cards and passes. Breaks in the series: 2020-21: ORR marks a break in its journey estimates from this year. 2021-22: ORR marks a break in its journey estimates from this year. 2022-23: London and South East operators’ journeys include an estimate for Freedom Pass travel that ORR says is likely to be understated this year.

The numbers behind this chart
Passenger journeys: Transport for Wales Rail and comparisons (Passenger journeys, million)
YearTransport for Wales Rail
2011-1228.4
2012-1329.0
2013-1429.9
2014-1530.8
2015-1631.5
2016-1732.3
2017-1832.9
2018-1933.5
2019-2031.8
2020-215.0
2021-2217.6
2022-2323.2
2023-2426.2
2024-2531.3
2025-2634.5

Figure as of 18 June 2026. Source: Office of Rail and Road.

Staff costs: Transport for Wales Rail and comparisons

The operator’s staff costs in 2025-26 prices (ORR table 7226). ORR does not publish the number of staff by operator.

The numbers behind this chart
Staff costs: Transport for Wales Rail and comparisons (Staff costs, £ million)
YearTransport for Wales RailAll franchised operators, Great Britain
2015-16
Details for 2015-16
155.23,904.0
All franchised operators, Great Britain
3,904.0
2016-17
Details for 2016-17
143.94,048.0
All franchised operators, Great Britain
4,048.0
2017-18
Details for 2017-18
149.84,126.5
All franchised operators, Great Britain
4,126.5
2018-19
Details for 2018-19
157.54,329.2
All franchised operators, Great Britain
4,329.2
2019-20
Details for 2019-20
179.04,604.6
All franchised operators, Great Britain
4,604.6
2020-21
Details for 2020-21
189.84,577.6
All franchised operators, Great Britain
4,577.6
2021-22
Details for 2021-22
199.54,455.3
All franchised operators, Great Britain
4,455.3
2022-23
Details for 2022-23
206.64,172.8
All franchised operators, Great Britain
4,172.8
2023-24
Details for 2023-24
237.54,337.3
All franchised operators, Great Britain
4,337.3
2024-25
Details for 2024-25
263.44,603.9
All franchised operators, Great Britain
4,603.9

Figure as of 25 November 2025. Source: Office of Rail and Road.

What these figures do and don't show

  • Subsidy is a net figure. Government payments to the operator less any premium it paid; ORR publishes it from the operator’s accounts from 2015-16, and before that from the government’s payment records, so there is a break in 2015-16.
  • From March 2020 the government took the fares. Emergency agreements and then national rail contracts moved revenue risk to the government, so subsidy rose as fares fell; years before and after are not like for like.
  • Per journey and per kilometre are worked out here from ORR’s subsidy and usage tables. Long-distance operators carry passengers further, so per kilometre is the fairer comparison between them and commuter operators.
  • Punctuality is not only the operator’s doing. Delays caused by Network Rail, other operators and outside events count against the operator whose train was late.
  • Nothing here shows cause and effect. Subsidy, punctuality and passenger numbers are shown side by side.

Where this sits: United Kingdom → Wales → Railways, Wales → Transport for Wales Rail. Figures from data/services/transport.json, generated 29 September 2026.

Use this data

The figures belong to the bodies that published them and are used under their terms, listed in Sources for this page; most are Crown copyright under the Open Government Licence. Only our own words, analysis, charts and derived calculations are ours, published under CC BY 4.0: reuse them, including commercially, if you credit Tekstak Ltd and link back to this page.

Download

Sources for this page

Each source's figures are used under the licence shown. Our own words, analysis, charts and derived calculations are ours, under CC BY 4.0.

Sections